Open Modal

MO-2 Bridge over Mineral Creek near Leeton is Now Open

new-recently-built-highway-in-brcko-district-bosnia-and-herzegovina
new-recently-built-highway-in-brcko-district-bosnia-and-herzegovina

picture Designed by FreePik

 

The Missouri Highway 2 bridge over Mineral Creek near Leeton is NOW OPEN. The bridge had been closed since June 2024 for a scheduled bridge replacement.

Motorists are reminded to slow down and pay attention while driving in work zones. Not all work zones look alike. Work zones can be moving operations, such as striping, patching or mowing. They can also be short term, temporary lane closures to make quick repairs or remove debris from the roadway.

John Doe

John Doe

Share a little biographical information to fill out your profile. This may be shown publicly. Such a coffee drinker, a late night sleeper, or whatever sound clumsy.

View All Posts

Recommended Posts

Loading...